Alderley Edge STW, Phosphorus Removal

Project Description

Alderley Edge Sewage Treatment Works (STW) is a medium sized activated sludge plant (ASP). In AMP7, under the Water Framework Directive (WFD), the site has to meet a new total phosphorus (TP) consent of 0.3 mg/l, and an Iron consent of 4 mg/l. To achieve these new consent standards, United Utilities installed a FilterClear® plant. The decision was based on a comprehensive whole life cost (WLC) assessment of various tertiary solids removal (TSR) plants. The FilterClear® skid was assembled and hydraulically tested off-site at Bluewater’s works, before being transported to site for installation on a flat concrete slab. The site was commissioned with Ferric dosing for P removal, and the FilterClear performance demonstrated that the compliance can be achieved reliably.
Project Name:Alderley Edge
Client:United Utilities
Capacity:108 L/s
Main Contractor:C2V+
Project Scope:Design, supply
& commission

Project Highlights

  • Off-site manufacture
  • Consent of 0.3 mg/l TP and 4 mg/l Fe
  • Rapid installation and commissioning
  • No separate flocculation tank needed

Scope of Works

Design, procurement, manufacture, installation and commissioning of Bluewater Bio’s proprietary FilterClear® 4V2800 plant. Fully automated and instrumented tertiary filtration system for Total Phosphorus removal.

Project Duration

FilterClear delivered: July 2022 Installation time ~ 2 weeks Commissioning time ~ 2 weeks

Client Contact

Client organisation: United Utilities

Ledbury STW Process Parameters

Average flow81 l/s
Maximum flow150 l/s
Design Influent TSS conc.
(incl. chemical solids)
16 mg/L (average)
34 mg/L (98%ile)
Effluent TP consent0.3 mg/L (average)
Effluent Fe consent4 mg/L (95%ile)

[INSERT CONTENT]

Share the Post:

Related Case Studies

Contact Our
NeoTech Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
CFIC® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
HYBACS® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our Team

Please complete the form with as much detail as possible about your project and one of our technology team will get back in touch with you as soon as possible:

Contact Our
FilterClear® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible: