Project Description
Barton Sewage Treatment Works (STW) is a medium sized trickling filter works. In AMP6, under the Water Framework Directive (WFD), the site had to meet a
new total phosphorus (TP) consent of 0.5 mg/l, and an iron consent of 4 mg/l. To achieve these new consent standards, MMB (UU’s delivery partner) installed a FilterClear® plant.
The decision was based on a comprehensive whole life cost (WLC) assessment of various tertiary solids removal (TSR) plants. The FilterClear® skid was assembled and hydraulically tested off-site at Bluewater Bio’s works, before being transported to site for installation on a flat concrete slab.
The site was commissioned with two-point ferric dosing for P removal, and later the FilterClear® performance demonstrated that compliance can be reliably achieved without the 2nd point dosing, making it possible to simplify the operation and reduce the chemical
dosing cost.
Project Name: | Barton STW |
Client: | United Utilities |
Capacity: | 39 L/s |
Main Contractor: | Mott MacDonald Bentley |
Project Scope: | Design, supply & commission |
Project Highlights
• Off-site manufacture
• Consent of 0.5 mg/l TP and 4 mg/l Fe
• Rapid installation and commissioning
• No separate flocculation tank needed
Scope of Works
Design, procurement, manufacture, installation and commissioning of Bluewater Bio’s proprietary FilterClear® 3V1840 plant. Fully automated and instrumented tertiary filtration system for total phosphorus removal.
Project Duration
FilterClear® delivered: February 2020
Installation time ~ 2 weeks
Commissioning time ~ 2 weeks
Compliant by: April 2020
Client Contact
Client Organisation: United Utilities
Contact Person: David Ridge
Average Flow | 2,171 m3/d |
Maximum Flow | 3,346 m3/d (39 l/s) |
Design Influent TSS conc. (incl. allowance for chemical dosing) | 35 mg/L (average) 45 mg/L (98%ile) |
Effluent TP consent | 0.5 mg/L (average) |
Effluent Fe consent | 4 mg/L (95%ile) |