Brockhampton STW is a medium sized activated sludge works treating the Cheltenham catchment, comprising domestic sewage, trade effluent and the effluent from
the Cheltenham race course. The works treats a FFT of 105 l/s. The consent limits are: TSS 25 mg/l, BOD 15 mg/l, AmmN 5 mg/l.
In AMP6, under the Water Framework Directive (WFD), the site has to meet more stringent standards, including
a new total phosphorus (TP) consent of 0.25 mg/l, and Fe of 4 mg/l. To achieve these new consent standards, Costain (Severn Trent’s main contractor) installed a chemical dosing facility and a FilterClear® plant. The decision was made based on a comprehensive whole life cost (WLC) assessment of various tertiary solids removal (TSR) plants.
The FilterClear® plant was fully assembled and hydraulically tested off-site at Bluewater Bio’s works, before being transported to site for installation on a flat concrete slab.

Project Name:Brockhampton STW
Client:Severn Trent
Capacity:105 L/s
Main Contractor:CiM6
Project Scope:Design, supply
& commission

Project Highlights

• Off-site manufacture

• Consent of 0.25 mg/l TP and 4 mg/l Fe

• Rapid installation and commissioning

• No separate flocculation tank needed

Scope of Works

Design, procurement, manufacture, installation and commissioning of Bluewater Bio’s proprietary FilterClear 4v2040 plant. Fully automated and instrumented tertiary filtration system for Total Phosphorus removal for the works final effluent. MCC and cabling by main contractor.

Project Duration

Award to delivery to site ~ 12 weeks
Installation time ~ 4 days
Commissioning time ~ 8 days

Client Contact

Client organisation: Severn Trent

Contact person: Jeremy Swift (MEICA Engineer)

Brockhampton STW Process Parameters

DWF4,220 m3/d
FFT9,072 m3/d (82 l/s)
Design Influent TSS conc.
(incl. allowance for chemical dosing)
34 mg/L (average)
39 mg/L (95%ile)
Influent TP concentration1 mg/L (95%ile)
Effluent TP consent0.25 mg/L (average)
Effluent Fe consent4 mg/L (95%ile)
Share the Post:

Related Case Studies

Bolsover STW Phosphorus Removal

The FilterClear installation at Bolsover forms part of the national CIP program, to ascertain the feasibility and real costs associated with achieving low (0.5 mg/L) to ultralow (0.1 mg/L) total phosphorus consents.

Read More

HYBACS Upgrade at Tsakane WwTW

Following rapid catchment growth, East Rand Water Company(ERWAT) required an upgrade from 10 MLD to 20 MLD at its Tsakane WwTW. The existing works comprised a single biological nutrient removal (BNR) reactor which could not be taken out of service for long periods of time.

Read More

Jubail HYBACS Upgrade at IWTP-8

Industrial Wastewater Treatment Plant no.8 (IWTP8) treats effluent from most of the industrial area in the city of Jubail, Saudi Arabia. The plant comprises three parallel streams; stream 2 was based on the activated sludge process and treated around 25 MLD to the Saudi RCER-1999 Irrigation Water standard.

Read More

Contact Our
NeoTech Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
CFIC® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
HYBACS® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our Team

Please complete the form with as much detail as possible about your project and one of our technology team will get back in touch with you as soon as possible:

Contact Our
FilterClear® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible: