Project Description
Rowde Sewage Treatment Works (STW) is a medium
sized trickling filter works. In AMP7, under the Water
Framework Directive (WFD), the site has to meet a
new total phosphorus (TP) consent of 0.5 mg/l, and an
Iron consent of 4 mg/l. To achieve these new consent
standards, Wessex Water installed a FilterClear® plant.
The decision was based on a comprehensive whole life
cost (WLC) assessment of various tertiary solids removal
(TSR) plants. The FilterClear® skid was assembled and
hydraulically tested off-site at Bluewater’s works, before
being transported to site for installation on a flat
concrete slab.
The site was commissioned with Ferric dosing for P
removal, and the FilterClear performance demonstrated
that the compliance can be achieved reliably.
Project Name: | Rowde STW |
Client: | Wessex Water |
Capacity: | 32 L/s |
Project Scope: | Design, supply & commission |
Project Highlights
- Off-site manufacture
- Consent of 0.5 mg/l TP and 4 mg/l Fe
- Rapid installation and commissioning
- No separate flocculation tank needed
Scope of Works
Design, procurement, manufacture, installation
and commissioning of Bluewater Bio’s proprietary
FilterClear® 3V2040 plant. Fully automated and
instrumented tertiary filtration system for Total
Phosphorus removal.
Project Duration
Client Contact
Client organisation: Wessex Water
Contact person: Andrew Gulliford (Process Manager)
Rowde STW Process Parameters
Average flow | 16 L/s |
Maximum flow | 32 L/s |
Design Influent TSS conc. (incl. chemical solids) | 58 mg/L (average) 77 mg/L (98%ile) |
Effluent TP consent | 0.5 mg/L (average) |
Effluent Fe consent | 4 mg/L (95%ile) |