bwb-logo-white

Our Blog

Upgrading of Secondary Treatment Using HYBACS at Tubli WPCC

The existing activated sludge plant at Tubli Water Pollution Control Centre (WPCC) was designed to treat a daily flow rate of 200,000m3/d. However, due to the continuing rapid growth of Bahrain, the flow rate into the works was in excess of 300,000m3/d and this is only expected to increase in
the future.

Read More

Contact Our
NeoTech Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
CFIC® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
HYBACS® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our Team

Please complete the form with as much detail as possible about your project and one of our technology team will get back in touch with you as soon as possible:

Contact Our
FilterClear® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible: