Itchen Bank STW, Phosphorus Removal

Project Description

Itchen Bank Sewage Treatment Works (STW) is a medium sized oxidation ditch site. Under the Water Framework Directive (WFD), the total phosphorus (TP) consent on site has been tightened from 0.6 mg/l
to 0.3 mg/l.
To achieve the more stringent TP consent, MWH Treatment (Severn Trent’s delivery partner) installed
a FilterClear® plant with with 1st point ferric dosing into the oxidation ditch and a 2nd point ferric dose into a static mixer upstream of the FilterClear® plant..
The decision was based on a comprehensive whole life cost (WLC) assessment of various tertiary solids removal (TSR) plants.
The FilterClear® skid was assembled and hydraulically tested off-site at Bluewater Bio’s works, before being transported to site for installation on a flat concrete slab.

Project Name:Itchen Bank STW
Client:Severn Trent Water
Capacity:127 L/s
Main Contractor:MWH Treatment
Project Scope:Design, supply
& commission

Project Highlights

• Off-site manufacture

• Consent of 0.3 mg/l TP and 4 mg/l Fe

• Rapid installation and commissioning

• No separate flocculation tank needed

Scope of Works

Design, procurement, manufacture, installation and commissioning of Bluewater Bio’s proprietary FilterClear 4V2550 plant. Fully automated and instrumented tertiary filtration system for total phosphorus removal.

Project Duration

FilterClear delivered: October 2020
Installation time ~ 2 weeks
Commissioning time ~ 2 weeks
Compliant by: April 2021

Client Contact

Client organisation: Severn Trent

Contact Person: Lewis McGregor

Itchen Bank STW Process Parameters

Average Flow4,207 m3/d
Maximum Flow10,930 m3/d (127 l/s)
Design Influent TSS conc.
(incl. allowance for chemical dosing)
42 mg/L (average)
58 mg/L (98%ile)
Effluent TP consent0.3 mg/L (average)
Effluent Fe consent4 mg/L (95%ile)
Share the Post:

Related Case Studies

Bolsover STW Phosphorus Removal

The FilterClear installation at Bolsover forms part of the national CIP program, to ascertain the feasibility and real costs associated with achieving low (0.5 mg/L) to ultralow (0.1 mg/L) total phosphorus consents.

Read More

HYBACS Upgrade at Tsakane WwTW

Following rapid catchment growth, East Rand Water Company(ERWAT) required an upgrade from 10 MLD to 20 MLD at its Tsakane WwTW. The existing works comprised a single biological nutrient removal (BNR) reactor which could not be taken out of service for long periods of time.

Read More

Jubail HYBACS Upgrade at IWTP-8

Industrial Wastewater Treatment Plant no.8 (IWTP8) treats effluent from most of the industrial area in the city of Jubail, Saudi Arabia. The plant comprises three parallel streams; stream 2 was based on the activated sludge process and treated around 25 MLD to the Saudi RCER-1999 Irrigation Water standard.

Read More

Contact Our
NeoTech Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
CFIC® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
HYBACS® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our Team

Please complete the form with as much detail as possible about your project and one of our technology team will get back in touch with you as soon as possible:

Contact Our
FilterClear® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible: