Wellesbourne STW, Phosphorus Removal

Project Description

Wellesbourne Sewage Treatment Works (STW) is a medium sized activated sludge plant (ASP). Under the Water Framework Directive (WFD), the site had to meet a new total phosphorus (TP) consent of 0.4 mg/l, and an iron consent of 4mg/l.
To achieve these new consent standards, MMB (Severn Trent’s delivery partner) installed a FilterClear® plant with 1st point ferric dosing upstream of primary settlement and a 2nd point ferric dose into a static mixer upstream
of the FilterClear® plant. The decision was based on a comprehensive whole life cost (WLC) assessment of various tertiary solids removal (TSR) plants.
The FilterClear® skid was assembled and hydraulically tested off-site at Bluewater Bio’s works, before being transported to site for installation on a flat concrete slab. The plant was designed to allow a 4th filter to be added in the future, as the flow is expected to increase.

Project Name:Wellesbourne STW
Client:Severn Trent Water
Capacity:46 L/s
Main Contractor:Mott MacDonald Bentley
Project Scope:Design, supply
& commission

Project Highlights

• Off-site manufacture

• Consent of 0.4 mg/l TP and 4 mg/l Fe

• Rapid installation and commissioning

• No separate flocculation tank needed

Scope of Works

Design, procurement, manufacture, installation and commissioning of Bluewater Bio’s proprietary FilterClear® 3V1840 plant. Fully automated and instrumented tertiary filtration system for total phosphorus removal.

Project Duration

FilterClear® delivered: March 2021
Installation time ~ 2 weeks
Commissioning time ~ 2 weeks
Compliant by: April 2021

Client Contact

Client organisation: Severn Trent

Contact Person: Lewis McGregor

Wellesbourne STW Process Parameters

Average Flow1,752 m3/d
Maximum Flow3,984 m3/d (46 l/s)
Design Influent TSS conc.
(incl. allowance for chemical dosing)
32 mg/L (average)
45 mg/L (98%ile)
Effluent TP consent0.4 mg/L (average)
Effluent Fe consent4 mg/L (95%ile)
Share the Post:

Related Case Studies

Contact Our
NeoTech Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
CFIC® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our
HYBACS® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible:

Contact Our Team

Please complete the form with as much detail as possible about your project and one of our technology team will get back in touch with you as soon as possible:

Contact Our
FilterClear® Team

Please complete the form and one of our technology team will get back in touch with you as soon as possible: